ÖBB ETZ St. Pölten - Akku and PN 127 Maintenance Hangars

Construction of a new maintenance facility for electric multiple units and expansion of the existing facility. On-site construction supervision on behalf of ÖBB Technische Services GmbH.

No items found.

A new maintenance hall is being built at the ÖBB workshop site in St. Pölten, which will primarily be used for the maintenance of electric multiple units (EMUs). In addition to three hall tracks, the project includes storage areas as well as office and social rooms for around 45 employees.

The new ETZ – Akku building comprises the construction of a multifunctional maintenance hall with three hall tracks for servicing various types of vehicles. The hall is equipped with comprehensive machinery such as crane systems, roof work platforms, swiveling overhead lines, and wheel and bogie technology, and is complemented by storage, office, and social areas.

At the same time, the existing hall (Object 127) will be extended on the south side. The extension will include additional work stations with assembly pits, modifications to the track system, and the expansion of the technical infrastructure to increase processing capacity.

The work is being carried out in close coordination with parallel trades and ongoing workshop operations. The focus is on coordinating construction processes, ensuring dust/noise protection measures, and the timely implementation of structural engineering, track construction, and technical upgrades.

TO THE LIVE VIEW

FACTS

Subproject Object 127

Period: October2025–September 2026

Cost: approx. 10 million euros

Scope of work: Local construction supervision (ÖBA)

Trade structure: General contractor, roof work platform, diesel smoke extraction, crane systems

ETZ subproject – Battery Hall

Period: November2025 – December 2026

Scope of work: Local construction supervision (ÖBA)