ÖBB Dosto New
New construction of a depot for the maintenance of rail vehicles at the Vienna Floridsdorf freight station Angerer Straße. Project management on behalf of ÖBB Technische Services GmbH.




.webp)
.webp)
.webp)
.webp)
.webp)
.webp)

.webp)
.webp)
In order to fulfill the maintenance concept for the new electric railcars in a four-car version (approx. 110 m vehicle length) and a six-car version (approx. 160 m vehicle length) of ÖBB Personenverkehr AG, a maintenance workshop is being built at the Vienna Floridsdorf freight station Angerer Straße. This includes 2 workshop tracks for four-part vehicles (hall length approx. 135m), 4 workshop tracks for six-part vehicles (hall length approx. 185m), approx. 1500 m² of storage space, approx. 300 m² of office and social rooms and a truck access road to the warehouse.
Three double-track hall bays are being built. The six hall tracks will be connected from the north via a new rail yard. The hall tracks are support tracks. Connecting tracks, waiting tracks and pull-out tracks are required to connect the new track yard.
FACTS
Total construction volume: €113 million
Period: July 2022 - June 2026
Trade structure: master builder; electrician; steel construction and locksmith; building services; floor and tiling; painter; interior work; track construction; facade, roof and gates; overhead line; locking system; sand system; signaling system